Investment-grade energy audits, with the savings verified on the meter to the IPMVP and ISO 50002 / 50015 — so the figure your lender or board relies on is measured, not estimated from a datasheet.
Consulting
We instrument the main incomer and the large drivers, log a full production cycle, and build the baseline from data — not assumptions. Each efficiency measure is costed and ranked by the marginal cost of energy saved, then written into a tender-ready scope you approve before any spend.
Nothing is sold on a headline payback figure. Every recommendation is tied to a number your lender, your board or your regulator can check for themselves — and where a saving cannot be measured, we do not claim it.
Following the IPMVP, we agree the baseline and the adjustment variables with you in writing, then report monthly against an adjusted baseline for at least twelve months after commissioning. Where performance drifts, we say so and find the cause — that report is in your portal either way.
We work to ISO 50002 for audits and the IPMVP and ISO 50015 for verification. Where an audit is a legal obligation rather than a choice, we file to the cycle that governs you — the EPRA energy management regulations in Kenya, Law 47-09 in Morocco, the Energy Efficiency Directive in the EU, ESOS in the UK, the PAT scheme in India.
Four phases, and the first one is yours as much as ours. An audit that starts before the data question is settled produces a report nobody can act on.
Twelve months of utility bills, the single-line diagram, production or occupancy figures for the same period, and the maintenance history of the main plant. We tell you within a week whether the data supports an investment-grade audit or whether metering has to come first. That answer is free, and it is sometimes no.
Logging on the main incomer and on each significant energy user, across a full production cycle rather than a convenient week. In a plant with seasonal output that means waiting for the season. We would rather tell you that than model around it.
Consumption regressed against the drivers that actually move it — production volume, degree days, occupancy, shift pattern. The baseline is a model with a stated accuracy, not an average of last year, and you see the residuals.
Each measure costed and ranked by the marginal cost of energy saved, with its own measurement plan attached. What you receive is a tender-ready scope of works, not a list of suggestions.
The protocol offers four measurement approaches, and choosing the wrong one is the most common reason a savings claim collapses under scrutiny. The choice is made before the work starts, written into the M&V plan, and agreed with your lender if there is one — changing it afterwards to flatter a result is precisely what the protocol exists to prevent.
| Option | What it measures, and when it is the right choice |
|---|---|
| Option A Retrofit isolation, key parameter |
Measures the parameter that matters and estimates the rest from engineering values. Suited to a lighting replacement or a motor swap where operating hours are stable and the power draw is the only real unknown. Cheapest, and defensible only when the estimated parameters genuinely do not move. |
| Option B Retrofit isolation, all parameters |
Everything in the boundary is measured, nothing estimated. The right answer for a variable-speed drive retrofit or a compressor replacement, where load varies and an assumed duty cycle would decide the result. More instrumentation, far fewer arguments. |
| Option C Whole facility |
Savings read at the main meter against a baseline adjusted for production and weather. Appropriate when the measures are numerous or interacting and the expected saving is large enough to rise above the noise — typically above ten per cent of total consumption. This is the option most energy performance contracts are written on. |
| Option D Calibrated simulation |
A building or process model calibrated against measured data. Reserved for cases where no usable baseline exists — a new build, or a site so reconfigured that its own history no longer describes it. The calibration, not the simulation, is what makes it credible. |
We state the option, the measurement boundary, the adjustment variables and the expected accuracy in writing before any work is commissioned. If your financing depends on the savings, your lender's adviser reviews that plan at the same time you do.
Energy balance, significant energy users, measured baseline with its accuracy stated, and every measure costed with its own payback and marginal cost of energy saved.
Option, boundary, adjustment variables, reporting period and accuracy — agreed before the work, and drafted to be annexed directly to an EPC or performance contract.
Technical specification and acceptance criteria written so that a supplier knows in advance how performance will be measured. Suppliers bid differently when they do.
For at least twelve months after commissioning, against the adjusted baseline, delivered to your client portal. Including the months where performance drifts.
Twelve months of electricity and fuel bills, your connected load or single-line diagram, production or occupancy figures over the same period, and one line on what prompted the question — a regulator, a lender, a tariff increase, or a board that has stopped believing the last study. That is enough for us to tell you the likely scope, the likely cost, and whether an audit is the right instrument at all. Send it to nishati@mwanga.partners or through the form below.
One built on logged measurement and an agreed baseline — precise enough for a lender or board to commit the capital expenditure behind it.
The International Performance Measurement and Verification Protocol, the reference framework for proving energy savings against an adjusted baseline. It defines the four options set out above.
At least twelve months after commissioning, reported monthly against the adjusted baseline agreed before any work began. Longer where the contract or the lender requires it.
Metering is installed on live switchgear during a planned outage or under permit, and logging is passive. The intrusive moment is the installation, measured in hours, scheduled around you.
It is the normal starting point, and it is why phase one exists. Where sub-metering is absent we price the temporary campaign separately, so you are not paying for instrumentation inside an audit fee you cannot unpick.
You do. Measurements, models and reports are yours, held in your portal, and exportable. We do not treat your consumption data as our asset.
Under EPRA's energy management regulations, designated facilities must audit on a defined cycle. We file to that cycle, and to the equivalent regime in each market you run.
It scales with the number of significant energy users and the metering required, not with your energy spend. We quote a fixed fee against a defined scope after phase one, and on performance mandates part of that fee depends on the verified result.
Request an audit
Send us the essentials and we'll come back to you.
Related services: Solar PV & storage · All services